Skip to main content
Search

Mehdi Heydari Shahna

1 related articles

Subscribe to updates
  1. arXiv

    An excavator stops taking language orders at face value: a one-use lease ties approval to the exact motion, cutting closed-site dumping from 1.23 to 0.33 cubic meters

    An LLM-directed excavator can execute mechanically feasible motion whose destination or authority no longer matches the operator's approval. The work binds authorization to the exact motion: a one-use lease ties the action, generated motion, mission contract and admission tolerance together, atomic dispatch rechecks current authority and measured joint drift, and revocation requests a carry-pitch quintic stop. Across a 672-case interface suite the gateway admitted all 120 benign cases and produced zero unauthorized dispatches in the attack suite; in synchronous simulation, dump-phase revocation cut maximum closed-site deposition from 1.23 to 0.33 cubic meters.

You’re all caught up